DIY week…

Some good progress on the renovation of the utility room (which was the ground floor bathroom at the back of the house) and the hallway, stairs and landing (HSL) area.

This slideshow requires JavaScript.

The wall paper has been stripped from most of the walls in the HSL and any holes filled in. Some of the hallway plaster had blown, mostly around where a long radiator used to be – the plaster had dried out too much. So, handy Matt knocked out a few places and filled it back in, mostly in a way approaching smooth and flat!

New skirting was also fitted on both sides and there were a few tricky padding out operations to be done. I made sure the skirting was raised off the tiled floor by about 15mm, to allow for new carpet which will go in the hallway once all the decorating has been done. We’re thinking something like sea grass matting or similar, which will be hard wearing right by the front door area.

The coving on the landing ceiling took a whole day in the end, due mainly to the really awkward angle on the new bathroom wall. Because of the 45 degree angle, the angle of the coving had to be 22.5 degrees, which was a total pain in the arse.

Claire was working on the utility and has painted everything, tiled and grouted and just a bit of boarding and skirting below the tiles to do, but a huge improvement. Tiling is very straight and it’s provided a much better area – final photos on the blog once it’s done.

We’re at the painting stage in the HSL so there will be some big visual improvements soon(ish) : )

out

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s