Built-in wardrobe construction…

I know what we’ll do during the wet holiday from work – build a new wardrobe!

The timber frame took me part of 2 days to finish, the plasterboarding took another day and the final wooden edging around all the corners took another part of a day. I mainly used 2×3 inch (5 x 7cm) smooth planed timber, held with a combination of long wood screws and corner metal brackets.

Claire finished off the whole thing by doing a grand job filling the plasterboard joins and then decorating. She also painted the head end wall (previously pink!) and some areas of the ceiling. She also made the curtains from fabric from the big blue and yellow shop (Ikea).

Just have to fit a door for the top storage section and a door stopper to stop the door hitting the side of the wardrobe!

That’s phase 34 of the house renovation (nearly) done…

out

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s